Adele
Adèle is a 55m aluminium performance Ketch displacing 300 t, built by Vitters and launched in 2004. She arrived in Auckland during October 09 and is currently in our Yard for comprehensive service and maintenance. She is described as a lady of the sea with classic forms that conceal avant-garde technological content. This is her second vist to Orams having first called during her maiden circumnavigation voyage.
Click on an image to enlarge

The project work for this major Refit of Adele, includes:
Haul out and launching
Main engine full service
Disconnect and service rig
Removing computers
Empty, clean and service all tanks
Remove and install 16 new hull zincs
Remove and service heater exchangers
Replace injectors
Replace all belts, zincs and filters

Paint bottom with 3 coats
Paint Penguin on bottom of boat
Varnish work (Exterior)
Sand cap rails with long boards
Block sand all other varnish on boat
Exterior varnish work
Paint work on deck
Repaint all Beige Awl grip on deck including bulwarks
Repaint inside of Dorade, Vivid Red Awl Grip
Sand fairing and repaint hull sides, cove stripe and boot stripe
Sand and paint inside beach
Repaint name in gold leaf
Remove and service side door and boarding ladder
Complete hot work for aft anchor roller removal
Remove thru hull for # 3 generator
Engine room Floor plates / Bilges / exhaust supports
Make New Plates as required


Sand, prime and paint all Rondal hatches
Clean and detail under generators
Clean and paint as required though out boatTeak, sand decks, Cap rail and caulking work
Replace 6 teak hand rails on cabin tops
Cap rail maintenance Remove and recualk all sika seems around cabins
Replace teak on cabin tops and locker lids
Remove and replace teak around chain plates
Remove and replace caulking on all teak deck seams

Remove all Rondal hatches
Supply and install protective covers for all Rondal hatches
Remove and replace inside hatch margins on all Rondal hatches
Remove and replace all outside hatch margins on all Rondal hatches
Reinstall glass and, hinges and dogs on all Rondal hatches
Reinstall all Rondal hatches in boat
Deck hatches Remove for service

Exhausts Cover and protect interior
Remove wood work to access exhausts
Reinstall wood workRemove and service side door and boarding ladder

PLC and Helm panels upgrades
Service all systems plus Interior Woodwork,All Varnish work and Carpentry throughout vessel

Rebuild all 3 alternators
Replace raw water pumps
Remove, inspect and service 20 Sea water valves
Air conditioning and heating systems - full service
Replace chilled & hot water pumps -service all pipeworks
Replace & remount both boiler elements x4 and service units
Air handlers – replaced 8 x units
Chiller plant - remove and install new unit
Rebuild and replace pumps
General pump work and paint pump inc rebuild & replace
Fire / bilge pump repairs
Emergency fire pump repairs
Replace all strip lighting with LED lighting
Remove # 3 generator and install Asea unit
Batteries - remove all and reinstall with new
install underwater lights at boarding ladder